Project Description

UPDATE

The Project Description below has changed. Since the initial submission, extensive time has been allocated to discussions with the City and agencies on items tied to civil engineering design. Following this extensive review, it is agreed to scope the application processing at this time to solely the Zoning By-Law Amendment of the “Village Square” lands, the north eastern quadrant.

This quadrant proposes 430 new dwelling units, with associated parking, access and open space, along with a commercial component.

Zest Communities Inc. is now proceeding with approvals for the “Cluster” and “Village Square” phases of the community. These phases are located along the northern limits of St. Elizabeth Village in the northwestern quadrant (the Cluster) and the northeastern quadrant (Village Square). Commercial space and a total of approximately 1,200 new dwelling units are proposed, with associated parking, access and open spaces. The northwestern quadrant “The Cluster” is proposed to be redeveloped as 4 to 12-storey apartment buildings arranged around a central green and redesigned storm pond system. The existing commercial component is proposed to be relocated to “The Village”. The northeastern quadrant “Village Square Retail and Village Square South” is proposed to be redeveloped as a mixed use commercial and residential area with 3 to 6-storey buildings centered around commercial uses and a village square, along with 1 ½ to 2-storey block and maisonette townhouse units. A portion of the existing St. Elizabeth Retirement Residence will be demolished, proposing an addition to accommodate more beds (increasing the permitted number of beds from 150 to 200) as well as an indoor swimming pool. In addition, to implement a comprehensive storm water management system, an amendment to the pond design (and associated Vegetation Protection Zones) requires refinement to the Urban Hamilton Official Plan designation.

Background

GSP Group Inc. has filed applications on behalf of Zest Communities Inc. for a portion of the property at 393 Rymal Road West. In 2014, the ownership and management of St. Elizabeth Village was transferred to Zest Communities. Zest Communities intends to redevelop the Village into a multi-phase, mixed use resort-style senior’s community, which has been rebranded under the new name of The Village at St. Elizabeth Mills. These applications continue the intention to redevelop the St. Elizabeth Village community into a multiuse development consisting of residential, commercial and amenity areas over the next decade.

The first Planning Act application to redevelop the property, was facilitated through the approval of a Zoning By-Law Amendment (ZAC-16-075) and the passage of Zoning By-Law 18-234 in September of 2018. The approvals permitted a 157 residential unit multiple dwelling with a maximum height of six storeys, along with a club house (including a pool, fitness centre, yoga, dance centre and multi-purpose room). A phased construction site plan application was submitted (DA-18-163), allowing for the construction of a five-storey, 76 unit apartment building.

The entire St. Elizabeth Village has an area of 46.1 hectares (114 acres) and is comprised of an existing private road network servicing commercial/office, institutional, residential and accessory uses. The Village is a mixed use community that is home to nearly 1,000 residents, and currently includes:

  • 556 Life Lease townhouses and apartments;
  • A multi-storey, multi bed assisted-living building;
  • A 4-storey commercial/retail building (the Village Centre);
  • St. Elizabeth of Hungary Catholic Church; and,
  • 5-storey 76 unit building under construction.

Internal updates have occurred within the St. Elizabeth Village community.

Community Open House (Webinar) occurred on November 24th, 2020 from 6:30pm to 8:30pm via Zoom. To view a recording of the webinar, please click here: https://youtu.be/lb4W4ADLGhQ

Various members of the project team presented information about the proposal which was followed by a live Q+A. During the webinar, attendees were able to type questions as well as up-vote other peoples’ questions. During the live Q+A, the project team responded to questions in order of how many votes a question received.

Responses to the written questions submitted prior to, during and following the webinar held on November 24th, 2020, can be found here.

April 1, 2024 – Submission to address comments received to date on previous submission related to Village Square lands (northeast quadrant).

May 2023 – Following previous submission, it was mutually agreed that the Applicant would scope the original Master Plan applications to be dedicated solely to the rezoning of the Village Square lands.

April 20, 2022 – Following previous submission, the Applicant worked directly with Engineering Staff from the City to address comments associated with the Site Servicing and Stormwater Management design for the Master Plan.   Second submission was made to the City to address outstanding comments on other technical matters associated with the OPA, ZBA, and DPS for the Master Plan excluding the ongoing engineering matters.

July 20, 2020 – Official Plan Amendment, Zoning By-law Amendment, and Draft Plan of Subdivision submitted to the City of Hamilton

August 19, 2020 – Application deemed completed by the City of Hamilton

November 24, 2020 – Online Public Webinar

February 18, 2021 – Receipt of all Agency and Department comments from application circulation

 

This page is intended to provide you with reports and other resources that are prepared during project development. The applications involved in these developments are a public process. It is our goal to keep you informed and involved at each stage.

Please contact the appropriate local municipality to ensure your comments become part of the public record.

If you have questions about a project, please contact the GSP Group Contact indicated.